Delhi Amritsar Katra Expressway – Information & Status
650 km Delhi – Amritsar – Katra (DAK) expressway project (NE-5 & NE-5A) by NHAI is an under construction 4-lane access-controlled road with a route…
650 km Delhi – Amritsar – Katra (DAK) expressway project (NE-5 & NE-5A) by NHAI is an under construction 4-lane access-controlled road with a route…
Ganga Expressway: With 94% land acquired for the six-lane, access-controlled greenfield Expressway project and all statutory clearances in hand, work on the project is likely…
Expressways in UP: Once considered as a BIMARU (sick) state, Uttar Pradesh is on a fast lane to development. In the 80s BIMARU was popularly…
Within days of Prime Minister Narendra Modi laying the foundation of 296 km Bundelkhand Expressway in Uttar Pradesh, the Yogi Adityanath government has now fast…
Yogi Adityanath had announced construction of Ganga expressway connecting Meerut with Prayagraj during Kumbh 2019. The project was pending for the last 15 years For…
The upcoming 594-km-long Ganga Expressway, as grand in its conception as the river along which it will be developed, is finally off the drawing board,…
Noida International Airport wins best infrastructure award from Architectural Review Future Projects The airport’s passenger terminal has been designed by Nordic, Grimshaw, Haptic, and STUP,…
YEIDA Extends Deadline for Film City Bids till May 30 The Yamuna Expressway Industrial Development Authority has once again extended the deadline for submitting bids for developing International…
Jewar | Noida International Airport – Status, Master Plan & Design Noida International Airport at Jewar, Uttar Pradesh is being developed by Flughafen Zürich AG…
The master plan, presented to the Board of the YEIDA, shows the region’s proposed planning along the 165-kilometre length of the Yamuna Expressway near Noida…
Yamuna Expressway or Taj Expressway is a 6-lane wide (expandable to 8) and 165.5 km long access-controlled expressway, connecting Pari Chowk in Greater Noida with…
340.82 km Purvanchal Expressway project by UPEIDA is an operational 6 lane access-controlled road with a route alignment connecting Chand Sarai Village in Lucknow District with…
1350 km Delhi – Mumbai Expressway (DME) project (NH-148N / NE-4) is an under construction 8 lane access-controlled road with a route connecting DND in…
Agra-Lucknow Access Controlled Expressway Project (Greenfield) As per the contract, the Construction period of the project was 36 months. Whereas the project was completed in…
594 km Ganga Expressway project by UPEIDA is an approved 6 lane greenfield access-controlled highway with a route alignment connecting NH-334 in Meerut District with…
82 km Delhi Meerut Expressway (DME) project, officially designed as National Expressway 3 (NE-3), is a partly operational and under construction access-controlled expressway with a…
296 km Bundelkhand Expressway project by UPEIDA is an under construction 4 lane access-controlled road with a route alignment connecting Kudrail Village in Etawah District with…